Project NameFlo Residence
DeveloperPublique Realty Pte Ltd (Jointly developed by ZACD and CDPL)
ArchitectADDP Architects LLP
Site Area154,399 sqft / 14,344 sqm
No. Of Units530 Residential Units
District19
Tenure99 years
Expected TOP6th Sept 2016
Carpark530 Carpark Lots
Unit Types
  • 2-bedroom: 764 to 861 sqft (96 Units)

  • 2-bedroom PES: 883 to 1055 sqft (5 Units)

  • 2-bedroom Roof Terrace: 990 to 1184 sqft (5 Units)

  • 3-bedroom: 926 to 1044 sqft (132 Units)

  • 3-bedroom PES: 1152 to 1356 sqft (8 Units)

  • 3-bedroom Roof Terrace: 1195 to 1206 sqft (5 Units)

  • 3-bedroom Premium: 1012 sqft (160 Units)

  • 3-bedroom Premium PES: 1184 to 1313 sqft (7 Units)

  • 3-bedroom Premium Roof Terrace: 1119 to 1227 sqft (5 Units)

  • 4-bedroom : 1227 to 1346 sqft (88 Units)

  • 4-bedroom PES: 1507 to 1655 sqft (4 Units)

  • 2-bedroom Penthouse: 1485 sqft (1 Units)

  • 3-bedroom Penthouse: 1755 to 2314 sqft (3 Units)

  • 3-bedroom Premium Penthouse: 1798 to 2067 sqft (5 Units)

  • 4-bedroom Penthouse: 2217 to 2551 sqft (6 Units)
  • 1. FOUNDATION
    Reinforced concrete and/or bored piles and/or spun piles

    2. SUPERSTRUCTURE
    Reinforced concrete and/or steel framed structure to engineer specification and drawings complying with CP65 and BS5950.

    3. WALLS
    a. External Walls:
    -Concrete and/or masonry walls and/or Precast Reinforced Concrete Wall and/or Fabricated Wall System.
    b. Internal Walls :
    -Masonry and/or lightweight concrete panels and/or in-situ and/or pre-cast RC wall and/or drywall partition system and/or glass partition and/or Fabricated Wall System

    4. ROOF
    a. Flat roof:
    -Reinforced concrete roof with approved waterproofing system and with or without insulation

    5. CEILING
    a. Apartment
    i. Corridors leading to Bedrooms, Bathrooms, Dry Kitchen, Kitchen:
    -Calcium silicate and/or fibrous plaster and/or gypsum ceiling board and/or box-ups to designated area with paint finish
    ii. Living, Dining, Bedrooms, Utility/Study, WC, Yard, DB Balcony, Open Balcony, Private Enclosed Space (PES):
    -Skim coat and/or Calcium silicate and/or fibrous plaster and/or gypsum ceiling box-up to designated area with paint finish

    b. Common Area
    i Lift Lobbies from 1st storey to 19th storey:
    -Calcium silicate and/or fibrous plaster and/or gypsum ceiling board and/or box-up and/or skim coat with paint finish
    ii Generally :
    -Skim coat with paint finish

    6. FINISHES
    a. Walls
    i. External
    Balcony, Open Balcony, Private Enclosed Space (PES), Roof Terrace: Paint finish on exposed surface only
    ii. Internal
    Living, Dining, Bedrooms, Corridor leading to Bedrooms, Utility, Yard, DB:
    -Paint finish to exposed surface only
    Bathrooms, W.C. :
    -Tiles and/or stone up to false ceiling height and on exposed surfaces only
    Kitchen :
    -Paint finish and/or tiles to exposed surfaces only.
    Dry Kitchen :
    -Paint finish to exposed surfaces only

    b. Floor (For Apartment)
    i Living, Dining, Dry Kitchen, Kitchen, Bathrooms, Utility, W.C, Yard, DB, Private Enclosed Space (PES), Balcony, Open Balcony, Roof Terrace, Stair to Roof Terrace:
    -Tiles
    ii All Bedrooms :
    -Timber Flooring

    c. Floor (Common Areas)
    i Lift Lobbies at 1st storey to 3rd Storey:
    -Stone / Tiles
    ii Lift Lobbies at Typical Storey:
    -Tiles

    Note: All floor finishes are to exposed surface area only.

    7. WINDOWS
    a. Bedrooms, Dining, Living (where applicable):
    -Powder coated aluminum framed casement and/or top hung and/or fixed window with anneal tinted and/or clear anneal float and/or tempered (with min 6mm thickness) and/or laminated glass (overall 10mm thickness).

    b. Bathrooms:
    -Powder coated aluminum framed top hung and/or fixed window with anneal frosted glass (with min 6mm thickness)

    c. Kitchen (where applicable):
    -Powder coated aluminum framed casement and/or top hung and/or fixed window with anneal tinted and/or clear anneal float glass (with min 6mm thickness)

    d. Yard (where applicable):
    -Powder coated aluminum framed casement and/or top hung and/or fixed window with anneal tinted and/or clear anneal float glass (with min 6mm thickness)

    8. DOORS
    a. Main Entrance :
    -Approved fire-rated timber door
    b. Living, Dining, Bedrooms to Private Enclosed Space (PES), Balcony, Open Balcony, Stair to Roof Terrace:
    -Powder coated aluminum framed clear or tinted tempered glass sliding door (with min 6mm thickness) and/or swing door
    c. Bedrooms, Bathrooms:
    -Timber sliding and/or swing door
    d. Kitchen (except Type A1p1, A1p2, A1, A1PH & A1R):
    -Powder coated aluminum and/or timber and/or clear tempered glass sliding (with min 6mm thickness) and/or timber swing door
    e. Yard :
    -Powder coated aluminum and/or timber clear tempered glass sliding (with min 6mm thickness) and/or swing door
    f. W.C., Utility, DB :
    -PVC bi-fold and/or powder coated aluminum and/or timber and/or swing door
    g. Private Enclosed Space (PES):
    -Railing height metal gate

    Good quality locksets and ironmongery to be provided to all doors.

    9. SANITARY WARES, FITTINGS AND ACCESSORIES
    Typical Unit
    (a) Master Bathroom
    – 1 shower cubicle with 1 shower mixer set
    – 1 wash basin with basin mixer
    – 1 water closet
    – 1 towel rail and/or towel hook
    – 1 toilet paper holder
    – 1 mirror
    – 1 rain shower (only for Type C1p, C2p, C1, C2, C1PH & C2PH)
    (b) Other Bathrooms
    – 1 shower cubicle with 1 shower mixer set
    – 1 wash basin with basin mixer
    – 1 water closet
    – 1 towel rail and/or towel hook
    – 1 toilet paper holder
    – 1 mirror
    (c) W.C.
    – 1 hand shower set (cold inlet only)
    – 1 water closet with integrated wash basin and tap
    – 1 toilet paper holder
    (d) Private Enclosed Space (PES) / Roof Terrace
    – 1 water tap (per unit)
    (e) Kitchen/ Yard
    – 1 bib tap (for washing machine)
    (f) Roof Terrace
    – 1 sink with tap
    – 1 Spa pool

    10. ELECTRICAL INSTALLATION
    a. Electrical wiring below false ceiling within the units shall generally be concealed where possible. Electrical wiring above false ceiling entrance to DB closet shall be in exposed conduits or trunking.
    b. Electrical Schedule:
    REFER TO SCHEDULE ATTACHED

    11. TV/TELEPHONE
    Refer to Electrical Schedule for details

    12. LIGHTNING PROTECTION
    Lightning protection system shall be provided in accordance with Singapore Standard SS555:2010

    13. PAINTING
    a. Internal Walls : Water-based emulsion paint
    b. External Walls : Approved water-based external paint

    14. WATERPROOFING
    Waterproofing shall be provided to floor slabs of Bathrooms, W.C, Kitchen, Yard, Balcony, Open Balcony, Roof Terrace, Private Enclosed Space (PES), Swimming Pool and Reinforced Concrete Flat Roof (where applicable).

    15. DRIVEWAY AND CARPARK
    a. Surface Driveway/ Ramp : Stone and/or pavers and/or tarmac and/or concrete
    b. Basement Car Park/Driveway : Reinforced concrete slab

    16. Gate and Fencing
    a. One number of 1.8m high metal side-gate
    b. 1.8m high boundary fence and/or wall

    17. RECREATION FACILITIES
    a. Tennis Court (Recreational)
    c. 50m Lap Pool
    d. Kid’s Pool
    e. BBQ Pit
    f. Gym
    g. Changing Rooms and Steam Rooms (Male & Female)
    h. Children’s Playground
    i. Exercise Station
    j. Theatrette
    k. Function Room
    l. Aqua Gym

    ADDITIONAL ITEMS
    a. Kitchen Cabinets
    -Kitchen cabinets with solid surface worktop and stainless steel sink with mixer.

    b. Kitchen Appliances
    -Cooker hood, cooker hob, oven

    c. Wardrobe
    -Quality built-in-wardrobes provided to all bedrooms.

    d. Air Conditioning
    -Wall-mounted air-conditioning system to Living, Dining, Bedrooms where applicable.

    e. Hot Water
    -Hot water supply provided to all Bathrooms and Kitchen except W.C and Yard.

    f. Town Gas
    – Town Gas supplied to all kitchens (except Type A1p1, A1p2, A1, A1PH & A1R)
    – Town Gas supplied to gas water heater to all units

    g. Security System
    – Telephony between 1st, 2nd and 3rd storey Lift Lobby to Apartment Units, where applicable, based on a telephone line system.
    – Automatic car barrier access system
    – Proximity card access system to 1st, 2nd and 3rd storey Lift Lobbies, and side gate where applicable.
    – Closed circuit television system at designated common areas.

    h. Waste Disposal System
    -Centralized waste disposal provided at common area.

    NOTES
    1. Marble, Granite and Limestone

    – Marble, granite and limestone are natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, it is not possible to achieve total uniformity and consistency of colour and appearance between the individual pieces of marble or granite. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite (being a much harder material than marble) cannot be re-polished after installation. Hence some differences may be felt at the joints. The final colour, tonality and pattern of marble or granite selected and installed shall be subject to availability.

    2. Timber
    – Timber strips are natural materials containing veins and tonality differences. Thus it is not possible to achieve total consistency of colour and grain in its selection and installation. Timber strips are also subject to thermal expansion and contraction beyond the control of the builder and vendor.

    3. Tiles
    – Selected tile sizes and tile surface flatness cannot be perfect and subject to acceptable range described in Singapore Standard SS483:2000.

    4. Glass
    – Glass is a manufactured material that is not 100% pure. Invisible nickel sulphide impurities may cause spontaneous glass breakage, which may occur in all glass by all manufacturers. The Purchaser is recommended to take up home insurance covering glass breakage to cover this possible event.

    5. Air-Conditioning System
    – To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned by the Purchaser on a regular basis. This includes the clearing of filters and condensate pipes, re-charging of refrigerant. The Purchaser is advised to engage his/her own contractor to service the air-conditioning system on a regular basis in order to ensure good working condition of the system.

    6. Mechanical Ventilation System
    – To ensure good working condition of the mechanical ventilation system for the exhaust system, the system has to be maintained by the Purchaser on a regular basis.

    7. False Ceiling
    – The space provision allows for the optimal function and installation of M&E services. Access panels are allocated for ease of maintenance access to concealed M&E equipment for regular cleaning purpose. Ceiling works would be required if removal of equipment is needed. Location of false ceiling is subject to Architect’s sole discretion and final design.

    8. Wardrobes, Kitchen Cabinets, Fan Coil Units, Electrical Points, Fittings, Wares and Plaster Ceiling Board
    – Layout/location of plaster ceiling board, kitchen cabinets, wardrobes, electrical points and fan coil units, fittings and wares are subject to Architect’s sole discretion and final design.

    9. Balcony, Open Balcony and Roof Terrace
    – Balcony and Open Balcony, which are open or covered by trellises should not be covered by roofs. Covering of the Balcony and Open Balcony constitutes additional gross floor area (GFA), which requires the necessary planning permission from the Authority and consensus of the Management Corporation.
    – Building height control does not allow any construction of trellises at the Roof Terrace.
    – Balcony screening to address end users needs to have some form of enclosure at balcony shall be installed by purchasers at their option. For avoidance of doubt, the lourve screen will not be provided by developer.

    10. Cable Television
    – The Purchaser is liable to pay annual fee, subscription fee and such other fee to the StarHub Cable Vision Ltd (SCV) or any other relevant party or authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels.

    11. Internet Access
    – If the Purchaser requires internet access, the Purchaser will have to make direct arrangement with the internet services provider and/or such relevant entities/authorities for internet services to his/her Unit and to make all necessary payments to the internet services provider and/or such relevant entities/authorities.

    12. Recreation Facilities
    – All recreation facilities are subject to approval by relevant authorities and/or technical requirement/compliance.

    13. Warranties
    – Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit / Building, the Vendor shall assign to the Purchaser such warranties at the time when possession of the Unit / Building is delivered to the Purchaser.

    14. Materials, Fittings, Equipment, Finishes, Installations and Appliances
    – The brand, colour and model of all materials, fittings, equipment, finishes, installations and appliances supplied shall be provided subject to Architect’s selection, market availability and the sole discretion of the Vendor.

    15. Web Portal of the Housing Project
    – The Purchaser will have to pay the annual fee, subscription fee or any such fee to the service provider of the Web Portal of the Housing Project as may be appointed by the Vendor or the Management Corporation when it is formed.